ORACLE SQL:填写缺少的日期

时间:2015-04-14 17:53:10

标签: sql oracle

我有以下代码,它为我提供了30天的生产日期和产量。

select 
(case when trunc(so.revised_due_date) <= trunc(sysdate) 
    then trunc(sysdate) else trunc(so.revised_due_date) end) due_date, 
(case 
    when (case when sp.pr_typ in ('VV','VD') then 'DVD' when sp.pr_typ in ('RD','CD') 
    then 'CD' end) = 'CD' 
    and  (case when so.tec_criteria in ('PI','MC') 
    then 'XX' else so.tec_criteria end) = 'OF'
    then sum(so.revised_qty_due)
end) CD_OF_VOLUME
from shop_order so
left join scm_prodtyp sp
on so.prodtyp = sp.prodtyp
where so.order_type = 'MD' 
and so.plant = 'W' 
and so.status_code between '4' and '8' 
and trunc(so.revised_due_date) <= trunc(sysdate)+30
group by trunc(so.revised_due_date), so.tec_criteria, sp.pr_typ
order by trunc(so.revised_due_date)

我遇到的问题是没有计划生产的日期,日期不会出现在报告上。有没有办法填补丢失的日期。

即。目前的报告显示以下内容......

DUE_DATE    CD_OF_VOLUME 
14/04/2015     35,267.00 
15/04/2015     71,744.00 
16/04/2015     20,268.00 
17/04/2015     35,156.00 
18/04/2015     74,395.00 
19/04/2015      3,636.00 
21/04/2015      5,522.00
22/04/2015     15,502.00
04/05/2015     10,082.00

注意:缺少日期(2015年4月20日,2015年4月23日至2015年5月3日)

范围始终是sysdate的30天。 你如何填写缺少的日期? 你需要某种日历表吗?

由于

3 个答案:

答案 0 :(得分:3)

您可以从SYSDATE获取30天的时间段(我假设您要包含SYSDATE?):

WITH mydates AS (
    SELECT TRUNC(SYSDATE) - 1 + LEVEL AS due_date FROM dual
   CONNECT BY LEVEL <= 31
)

然后使用上面的内容对您的查询执行LEFT JOIN(将查询放入CTE也许不错):

WITH mydates AS (
    SELECT TRUNC(SYSDATE) - 1 + LEVEL AS due_date FROM dual
   CONNECT BY LEVEL <= 31
), myorders AS (
    select 
    (case when trunc(so.revised_due_date) <= trunc(sysdate) 
        then trunc(sysdate) else trunc(so.revised_due_date) end) due_date, 
    (case 
        when (case when sp.pr_typ in ('VV','VD') then 'DVD' when sp.pr_typ in ('RD','CD') 
        then 'CD' end) = 'CD' 
        and  (case when so.tec_criteria in ('PI','MC') 
        then 'XX' else so.tec_criteria end) = 'OF'
        then sum(so.revised_qty_due)
    end) CD_OF_VOLUME
    from shop_order so
    left join scm_prodtyp sp
    on so.prodtyp = sp.prodtyp
    where so.order_type = 'MD' 
    and so.plant = 'W' 
    and so.status_code between '4' and '8' 
    and trunc(so.revised_due_date) <= trunc(sysdate)+30
    group by trunc(so.revised_due_date), so.tec_criteria, sp.pr_typ
    order by trunc(so.revised_due_date)
)
SELECT mydates.due_date, myorders.cd_of_volume
  FROM mydates LEFT JOIN myorders
    ON mydates.due_date = myorders.due_date;

如果您想在“缺失”日期而不是NULL上显示零,请使用上面的COALESCE(myorders.cd_of_volume, 0) AS cd_of_volume

答案 1 :(得分:1)

你能做的是: 用你需要的所有日子创建一个新表。

WITH DAYS AS
(SELECT TRUNC(SYSDATE) - ROWNUM DDD
 FROM ALL_OBJECTS
 WHERE ROWNUM < 365)
SELECT
  DAYS.DDD
FROM

  DAYS;

然后在桌子之间进行全外连接:

select  DUE_DATE ,   CD_OF_VOLUME , DDD
from (
    select 
    (case when trunc(so.revised_due_date) <= trunc(sysdate) 
        then trunc(sysdate) else trunc(so.revised_due_date) end) due_date, 
    (case 
        when (case when sp.pr_typ in ('VV','VD') then 'DVD' when sp.pr_typ in ('RD','CD') 
        then 'CD' end) = 'CD' 
        and  (case when so.tec_criteria in ('PI','MC') 
        then 'XX' else so.tec_criteria end) = 'OF'
        then sum(so.revised_qty_due)
    end) CD_OF_VOLUME
    from shop_order so
    left join scm_prodtyp sp
    on so.prodtyp = sp.prodtyp
    where so.order_type = 'MD' 
    and so.plant = 'W' 
    and so.status_code between '4' and '8' 
    and trunc(so.revised_due_date) <= trunc(sysdate)+30
    group by trunc(so.revised_due_date), so.tec_criteria, sp.pr_typ
    order by trunc(so.revised_due_date)
)  full outer join   NEW_TABLE new on (    new .DDD =  DUE_DATE     )
  where new .DDD between   /* */   AND   /* */   /*   pick your own limit) */

答案 2 :(得分:1)

您可以使用gapsconnect by来获取left join

假设您的架构是:

create table tbl(DUE_DATE date, CD_OF_VOLUME float);
insert into tbl values(to_date('14/04/2015','DD/MM/YYYY'),35267.00);
insert into tbl values(to_date('15/04/2015','DD/MM/YYYY'),71744.00); 
insert into tbl values(to_date('16/04/2015','DD/MM/YYYY'),20268.00); 
insert into tbl values(to_date('17/04/2015','DD/MM/YYYY'),35156.00); 
insert into tbl values(to_date('18/04/2015','DD/MM/YYYY'),74395.00); 
insert into tbl values(to_date('19/04/2015','DD/MM/YYYY'),3636.00); 
insert into tbl values(to_date('21/04/2015','DD/MM/YYYY'),5522.00);
insert into tbl values(to_date('22/04/2015','DD/MM/YYYY'),15502.00);
insert into tbl values(to_date('04/05/2015','DD/MM/YYYY'),10082.00);
你可以说:

with cte as
(
  select (select min(DUE_DATE)-1 from tbl)+ level as dt
  from dual
  connect by level <= (select max(DUE_DATE)-min(DUE_DATE) from tbl)
)
select to_char(c.dt,'DD/MM/YYYY') gap,null volume 
from cte c
left join tbl t on c.dt=t.DUE_DATE
where t.DUE_DATE is null
order by c.dt

结果:

GAP         VOLUME
20/04/2015  (null)
23/04/2015  (null)
24/04/2015  (null)
25/04/2015  (null)
26/04/2015  (null)
27/04/2015  (null)
28/04/2015  (null)
29/04/2015  (null)
30/04/2015  (null)
01/05/2015  (null)
02/05/2015  (null)
03/05/2015  (null)

注意:您可以在原始查询中实现此功能,最简单的方法是将查询包装起来,并将其用作子查询,而不是上面代码段中的 tbl

相关问题